Work in Progress

Mallard Lakes A pipe has been added to the lake side of the dam.  This pipe will be filled by an overflow siphon (inside the forms shown here).  The pipe at Eldorado will be a 60 inch pipe. Mallard Lakes Dam work in Progress This concrete baffle slows the discharged overflow water into the existing… Read More

 

Engineering Studies Obtained

The Association has obtained two engineering studies which study properties, equipment and other items owned by the Association and then project repair and replacement cost for these items. The Board of Directors uses these projections to fund the reserve from your annual assessments.  It is recommended to conduct Reserve Studies every five years. The Fisher-Smoucha… Read More