Archive for drainage easement
Work in Progress
Posted by: | CommentsMallard Lakes

A pipe has been added to the lake side of the dam. This pipe will be filled by an overflow siphon (inside the forms shown here). The pipe at Eldorado will be a 60 inch pipe.
Mallard Lakes Dam work in Progress

This concrete baffle slows the discharged overflow water into the existing creek at Mallard Lakes on the corner of Hardin Road. A similar but perhaps larger structure would be built on the Eldorado Homeowners Association property and discharge into the creek or the reflection ponds.
Discarge into Creek at Mallard Lakes

This photo shows the relationship of the concrete discharge baffle, the creek, and the top of the dam.
Reflection Pond Repair
Click here;(reflectionpond.pdf link here) to see the problems.
Woodstream and Colonial Drainage Easement
The Association contacted the city of McKinney concerning this drainage easement in the common areas between Woodstream Lane and Colonial Circle. The City has shaped the drainage easement and placed a seeded erosion preventative covering on the area.


